Barmoor Windfarm,
England

 

Barmoor Windfarm

Catamount Energy Ltd has submitted an application to the Berwick-Upon-Tweed Borough Council to build a 9-turbine wind farm at Barmoor to the Southwest of Berwick-Upon-Tweed, Northumberland, that will generate enough electricity for more than 15,000 homes.

The Barmoor site was selected after a lengthy process to identify potential wind farm sites across the UK, taking into account landscape sensitivities as well as planning, environmental and technical criteria.

The turbines will be a maximum of 110.5 meters high to the tip of the blades. In addition to the turbines, the wind farm will consist of a landscaped substation and access tracks. The project will connect to the Scottish Power distribution system to the North.

Barmoor is being jointly developed by Force 9 Energy and Catamount Energy Ltd (CEL). CEL will be the owner of the project and is a joint venture between Catamount Energy Corporation and Statkraft Development AS.

Back to Development Projects


 

Project Characteristics
Tower Height: 65 meters
Blade Length: up to 45meters
Total Height: up to 110.5 meters
Rotor Speed: up to 18 rpm
   
Number of
Turbines:
9
Generating Capacity: up to 27MW
Projected
Annual Output:
up to 71,000 MWh
   
Could supply up to 15,000 British households.

 

 